All the latest from the construction site

Time lapse of the building progress

It’s all go on our construction sites. These videos demonstrate this perfectly:

The new building complex is coming to life on our Campus in Zeulenroda-Triebes. It consists of Production Hall 5, which will also accommodate the BIC, the connected Raw Materials Warehouse (Hall 6), and the Community Center with the staff restaurant as well as conference rooms. Hall 5 is already being “built up”: After preparatory groundworks, the first supports are being erected.

Watch the video

During the expansion of Central Logistics, the steel structure of the shuttle warehouse is increasingly taking shape, as you can see in the video that was recorded a few days ago. 

Watch the video

Two large, key parts (in white) were delivered at the end of August and lifted into position: the spiral conveyors. They will transport boxes up and down via a spiral to the two conveyor technology levels of the shuttle warehouse. 

Watch the video